Alroy Oval Singleton is undergoing a major redevelopment to enhance its facilities and accommodate high-traffic sporting events.

In partnership with Weyn Constructions, we are installing commercial plumbing systems to ensure optimal functionality, efficiency, and compliance with regulatory standards.
The project includes:

  • Canteen & kitchen plumbing for seamless food service operations.
  • Change rooms & bathroom installations for athlete and spectator comfort.
  • Water reticulation system for efficient facility-wide distribution.

Trade waste management to meet environmental and safety regulations.
These critical upgrades will support the long-term success and sustainability of the venue.

Commercial Plumbing – Project Scope & Key Upgrades

1. Canteen & Kitchen Plumbing: Reliable & Compliant Food Service Operations

The sporting complex required a fully functional canteen and kitchen plumbing system to support food preparation while adhering to strict trade waste and environmental regulations.

Solution:

  • Installed water supply lines, gas connections, and wastewater drainage for kitchen operations.
  • Fitted a high-capacity grease trap to prevent blockages and ensure compliance.
  • Ensured proper ventilation and drainage systems to maintain hygiene.

Outcome:
With a commercial-grade kitchen setup, the facility now has a reliable, efficient, and regulation-compliant food service infrastructure.

2. Change Rooms & Bathrooms: High-Traffic, Durable Facilities

Challenge:
The change rooms and bathrooms needed robust plumbing systems to accommodate heavy daily use while ensuring efficient drainage and water supply.
Solution:

  • Installed sanitary drainage systems to manage wastewater effectively.
  • Set up high-capacity water supply lines for multiple showers and toilets.
  • Integrated durable fixtures and fittings designed for high-traffic public use.

Outcome:
The new modern, water-efficient bathrooms provide comfort, durability, and reliability for athletes, spectators, and staff.

3. Water Reticulation: Efficient Water Distribution Across the Facility

To ensure consistent water pressure and distribution, a well-planned reticulation system was required.
Our Solution:

  • Installed main water lines to distribute supply across all amenities.
  • Integrated pressure regulators and control valves to maintain flow efficiency.
  • Designed a system that minimizes water wastage and reduces maintenance needs.

Outcome:
The optimised water reticulation system ensures steady water supply across the entire sporting complex, preventing pressure fluctuations and improving overall efficiency.

4. Trade Waste Management: Ensuring Compliance & Sustainability

The facility’s commercial kitchen waste required a dedicated plumbing system to comply with local environmental standards.
Our Solution:

  • Installed separate trade waste lines to manage wastewater safely.
  • Implemented grease and sediment traps to prevent clogs and contamination.
  • Designed the system to comply with local government trade waste regulations.

Outcome:
The new trade waste system ensures safe disposal of kitchen wastewater, protecting both plumbing infrastructure and the environment.

Results & Benefits

With these key installations, Alroy Oval Singleton now benefits from:

  • Seamless Facility Operations – Reliable water supply and drainage across all amenities.
  • Improved Hygiene & Efficiency – Sanitary, regulation-compliant kitchen and bathroom systems.
  • Sustainable Water Management – Optimized water flow and reduced environmental impact.
  • Long-Term Durability – High-quality plumbing systems designed for continuous heavy use.

These upgrades create a modern, fully functional sporting venue, built to support athletes, spectators, and community events for years to come.