The project focused on three key areas:
- Stormwater drainage improvements to enhance sustainability and reduce flooding risks.
- Bathroom renovations to modernise facilities and improve water efficiency.
- New staff kitchen installations to enhance workplace comfort and functionality.
By implementing strategic commercial plumbing solutions, the dealership improved their long-term sustainability, usability, and overall experience for both staff and customers.
Commercial Plumbing Project Scope & Key Upgrades
1. High-Level Stormwater System Upgrade Challenge:
The dealership’s existing stormwater system required enhancements to prevent water pooling and flooding, particularly during heavy rainfall. An outdated drainage infrastructure posed a risk to both the building and surrounding areas.
The Solution:
Atkins Plumbing and Gas team installed a stormwater drainage system, designed to efficiently manage excess water while minimising environmental impact.
This included:
- Upgraded stormwater pits and drains to handle increased water flow.
- Improved water redirection strategies to prevent localised flooding.
- Sustainable drainage solutions to support water conservation and long-term durability.
Outcome:
The upgraded stormwater system significantly reduced water accumulation risks, ensuring that Kloster Hyundai’s premises remain dry, safe, and fully operational in all weather conditions.
2. Bathroom Renovations: Modern, Water-Efficient, & Accessible
Challenge:
The dealership required a modern refresh of its staff and customer bathrooms to improve aesthetics, accessibility, and water efficiency. The existing facilities were outdated and lacked the latest plumbing innovations.
The Solution:
- Installed new water-efficient fixtures, reducing overall water consumption.
- Upgraded toilets, sinks, and tapware for a sleek, modern look.
- Ensured full accessibility compliance, enhancing comfort for all users.
Outcome:
The upgraded bathrooms now provide a cleaner, more modern experience while reducing water wastage, aligning with sustainable business practices.
3. Staff Kitchen Installations: Functional & Ergonomic Workspaces
Challenge:
With staff spending long hours on-site, the dealership required new kitchen spaces that were ergonomically designed, easy to maintain, and well-equipped.
The Solution:
- Installed two brand-new kitchens with modern appliances and fixtures.
- Designed smart storage solutions to optimise space.
- Ensured efficient plumbing connections for seamless functionality.
Outcome:
The new staff kitchens now provided a comfortable and practical environment for employees to take breaks and recharge.